Transforming Canada's 2025 Headwinds into Middle-Market Advantage

  • Writer: AI staff
    AI staff
  • Jul 2
  • 5 min read

Updated: 2 days ago

canada project financing

Canada’s infrastructure and industrial pipeline still totals well over C$180 billion, yet 2025 is proving that raising capital and reaching financial close are no longer mechanical exercises in spreadsheet optimization. Sponsors are contending with higher real funding costs, a regulatory maze whose rules are being rewritten in real time, and supply-chain pressures that won’t fade simply because inflation has cooled. For developers in the $2 million–$100 million range—the segment Amimar International has served for over a decade—these macro frictions can feel existential. They do not have to be.


1. A Capital Market in Flux—but Not Closed

The Bank of Canada’s policy rate plateaued at 2.75% after two quarter-point cuts, keeping most prime rates near 4.95% and pushing construction-loan spreads on greenfield deals toward 275–350 basis points. Traditional lenders remain reluctant to go beyond 7–10-year tenors, so the centre of gravity has shifted to private credit and bespoke club deals.


OSFI’s 2025–26 Annual Risk Outlook flags wholesale credit quality and liquidity as top systemic threats, prompting banks to stress-test deals for another 200-basis-point shock and demand thicker equity cushions. While that constrains leverage, it also widens the lane for non-bank lenders hungry for floating-rate yield—and for advisory firms that can translate institutional requirements into executable structures.


 2. Policy Uncertainty Is the New Certainty

- Impact Assessment Act delays: Phase 1 reviews now average 332 days against a statutory target of 180 days, with some files frozen for almost two years.


- Trade friction: A 25% retaliatory tariff package on U.S. equipment has forced sponsors to add 8–12% cost contingencies, particularly for renewables components.


- Carbon-pricing pivots: Ottawa’s decision to zero-rate consumer fuel charges while preserving the Output-Based Pricing System leaves mixed price signals that complicate revenue modelling for low-carbon projects.


These moving pieces can shred critical-path schedules and erode the debt-service-coverage ratios that lenders demand. Early-stage regulatory mapping and scenario-based commercial modelling—core elements of Amimar International’s due-diligence platform—have therefore become non-negotiable.


 3. Indigenous Partnership: From Compliance to Value Creation

The federal Indigenous Loan Guarantee Corporation’s envelope expanded to C$10 billion this spring, accelerating a trend toward Indigenous equity stakes in large projects. Yet many Nations lack ready liquidity or investment-grade credit histories. Amimar International’s recent mandates have demonstrated that blending government guarantees with subordinated tranches can unlock participation without overstretching sponsor balance sheets—provided those instruments are structured before term-sheet negotiations harden.


 4. Cost, Labour and Logistics: Stabilizing, Not Retreating

Statistics Canada’s latest Building Construction Price Index shows costs still rising 3.4% (residential) and 3.5% (non-residential) year-over-year. Altus Group reports that increases have “levelled off” but remain above historical norms, while Turner & Townsend sees national escalation moderating to roughly 3% for 2026 amid tariff risks and wage pressure. Skilled-labour scarcity is acute; certified electricians and millwrights saw wage gains exceeding 4% in Q1 2025.


Project developers must therefore hard-wire dynamic cost-escalation clauses, leverage modular fabrication where feasible, and front-load procurement strategies—tactics that can remove as much as 40 basis points from the cost of debt when properly communicated to credit committees.


 5. ESG Scrutiny: From Glossy Reports to Debt-Pricing Leverage

Global lenders now routinely commission biodiversity, gender-equality and reconciliation assessments. These studies add C$1.5–2 million to transaction costs on projects above C$500 million, but—handled strategically—they also open access to concessional pools and mezzanine slices that cushion senior debt. Amimar International’s agile approach integrates ESG diligence into baseline feasibility work so it becomes a pricing asset rather than a closing obstacle.


Market Convulsions Sponsors Must Anticipate:

  • Interest-rate volatility that can erase 20–30% of headroom on projected cash flows.

  • Environmental-review extensions that add half a year—or more—to construction start.

  • Tariff-driven material spikes demanding double-digit contingency buffers.

  • Labour shortages that escalate wages faster than general inflation.

  • Stricter bank stress-tests that shrink maximum leverage ratios.


Sector-Specific Pain Points 

Sector

Prominent 2025 Finance Challenges

Renewable Energy

Scarcity of long-term power-purchase agreements (PPAs) in deregulated provinces undermines revenue certainty, complicating debt sizing.

Green Hydrogen

Fragmented provincial permitting processes and the absence of unified national standards slow project approvals and raise compliance costs.

Digital Infrastructure

Data center power demand is outpacing grid-expansion timelines, driving up interconnection fees and forcing reliance on costly on-site generation.

Mining & Critical Minerals

Dual federal-provincial environmental-assessment tracks create timing risk, while volatile commodity prices compress debt-service-coverage ratios.

Real Estate Mega-Developments

Elevated capitalization rates and tighter construction-loan availability keep equity requirements high despite improving demand fundamentals.


Our Insights for Resilient Mid-Cap Financing

1. Synchronize capital and consultation: Establish joint regulatory–Indigenous working groups at pre-feasibility stage to de-risk Phase 1 bottlenecks.

2. Blend private credit with guarantees: Use federal and provincial backstops to crowd in institutional investors while maintaining competitive pricing.

3. Lock in procurement agility: Deploy index-linked EPC contracts and early bulk purchasing to mute tariff exposure.

4. Embed ESG at the core: Treat environmental and social studies as pathways to green/future-fit capital rather than as compliance overhead.

5. Leverage data-driven scenario planning: Build capital-stack flexibility to absorb ±200 bp rate swings now demanded by OSFI-sensitized lenders.


The Road Ahead

Canada’s 2026 pipeline will reward sponsors who pivot from waiting for perfect policy clarity to engineering bankability amid ambiguity. Private credit’s rise, combined with the federal push for inclusive ownership models, expands the toolkit for creative structuring.


For developers in the $2 million–$100 million arena, the message is clear: capital is available, but only for projects that present a holistic, risk-priced, stakeholder-aligned story. Amimar International stands ready—with over two decades of risk-assessment expertise—to craft that story and translate it for institutional audiences, allowing our clients secure funding that endures through cycles. To learn more, contact us today.



Sources


OSFI releases fall update to the Annual Risk Outlook for 2024-2025 https://www.osfi-bsif.gc.ca/en/news/osfi-releases-fall-update-annual-risk-outlook-2024-2025


OSFI’s Annual Risk Outlook for Fiscal Year 2025-2026: Navigating a Complex… | Brayden York https://www.linkedin.com/posts/braydenyork_osfis-annual-risk-outlook-for-fiscal-year-activity-7311116269238329346-t22c


Altus Group Releases Its 2025 Canadian Cost Guide – Company Announcement https://markets.ft.com/data/announce/full?dockey=1330-9412087en-1QPBR5D4VFC3CENOVAL7E5SNU8


Altus Group Releases Its 2025 Canadian Cost Guide | Taiwan News | Mar. 27, 2025 21:00 https://www.taiwannews.com.tw/news/6070826




[The Daily — Building construction price indexes, first quarter 2025 https://www150.statcan.gc.ca/n1/daily-quotidien/250425/dq250425b-eng.htm





Here's why the Bank of Canada could be done cutting interest rates ... https://globalnews.ca/news/11295363/bank-of-canada-done-cutting-interest-rates/


This publication may be reused for noncommercial purposes if the source is cited as IFC, a member of the World Bank Group. https://www.ifc.org/content/dam/ifc/doc/mgrt/emcompass-note-98-private-credit-in-em-fin-jan2021.pdf









Private Markets Investments: American Dream or Disaster? · Luma https://lu.ma/h23ncu4g



20171213 PVR-532 L2516 Infrastructure Financing Facility Company Project https://www.adb.org/sites/default/files/evaluation-document/387651/files/pvr-532_6.pdf








 

Contact Us
CONTACT
LOCATIONS
OPENING HOURS

Email: info@amimarinternational.com
 

Tel: (514) 228-7493

MONTREAL

2001 Robert Bourassa,

Suite 1700

Montreal, QC  H3A 2A6

Canada

TORONTO

Toronto Exchange Tower

130 King Street West,

Suite 1900

Toronto, ON  M5X 1E3

Canada

Mon - Fri: 8am - 5pm

​​Sat-Sun: Closed

© 2025 by AMIMAR INTERNATIONAL INC

bottom of page