img { max-width: 100%; height: auto; }
top of page
Search

Renewable Energy Financing in 2025: What Lenders Require Now

  • Writer: AI staff
    AI staff
  • 4 days ago
  • 5 min read


renewable energy financing

Renewable energy financing in 2025 sits at an interesting crossroads. Deal activity is rising again after the turbulence of the last two years, supported by clearer supply-chain dynamics, more predictable EPC pricing, and an unprecedented amount of committed institutional capital targeting clean energy. Yet at the same time, lenders have become far more selective. The shift is not about reduced appetite; if anything, demand for renewable investments is strong. Instead, it’s about a recalibration of what is considered “bankable.”


As discussed in the opening article of our PF25 series, project finance volumes have returned, but the rules governing those approvals have changed. Renewable energy is the sector where this shift is most visible. Deals are getting funded, but only when they meet a far higher standard of evidence, discipline and risk transparency. In this first sector deep-dive, we explore what lenders are actually prioritizing in 2025—and what developers must prepare for when seeking financing.



1. Lenders Want Demonstrated Performance, Not Just Potential


A few years ago, the mere label of “renewable energy” carried an implicit de-risking effect. That is no longer the case. In 2025, lenders want projects that demonstrate operational credibility, not just conceptual promise.


This means they are paying much closer attention to the fundamentals:


  • documented technology performance,

  • OEM reliability and warranty structures,

  • the EPC’s record in similar markets,

  • and the stability and expertise of the O&M operator.


Developers relying on unproven configurations or next-generation technologies can still attract financing, but only if they can demonstrate bankability through third-party assessments, extended guarantees, or additional reserve structures. The burden of proof is now firmly on the sponsor.



2. PPA Quality Matters More Than the Price on the Page


In today’s market, lenders are far more concerned about the strength and clarity of a project’s revenue profile than they are about headline PPA pricing. Credit quality, contract tenor, curtailment exposure, grid stability, and off-taker history have become the defining components of PPA underwriting.


This shift is especially visible in regions with long interconnection queues or stressed grids. A generous tariff means little if the project faces curtailment risk or if the off-taker’s creditworthiness is questionable. Even merchant exposure is not automatically disqualifying, but it now requires hedging strategies, capacity payments, storage integration, or robust DSCR cushions to satisfy lenders’ concerns about volatility.



3. Storage Hybridization Has Become a Gatekeeper to Financing


It is increasingly difficult to finance standalone solar or wind at scale without some form of storage integration. Battery energy storage systems (BESS) give lenders confidence that the project can stabilize output, support PPA compliance, and reduce curtailment.


However, the addition of storage introduces its own review pathway. Lenders are scrutinizing degradation curves, warranty quality, insurance coverage, and the specific revenue stacking strategy that the project intends to pursue. The underwriting standard for BESS in 2025 is both more cautious and more structured than in prior cycles. Developers must now explain not only what the battery will do, but how its performance and revenue will be maintained over time.



4. DSCR Expectations Have Risen Across All Renewable Asset Classes


Lenders across the board have raised DSCR (Debt Service Coverage Ratio) requirements. This reflects persistent interest-rate uncertainty, historical construction cost inflation, and a desire to test project resilience under downside conditions.


In 2025, typical DSCR ranges include:


  • Solar: 1.30×–1.40×

  • Wind: 1.25×–1.35×

  • Hybrid solar + storage: 1.35×–1.50×

  • Bioenergy / WtE: 1.40×–1.55×


These numbers signal a clear trend: lenders want projects that can withstand price dips, production variability, or partial curtailment without threatening debt service.



5. Equity Requirements Have Shifted Upward


Higher DSCR thresholds naturally push leverage downward. Equity expectations have risen as a result, typically by five to ten percentage points compared to earlier cycles. Sponsors should now expect to commit:


  • Solar: 20%–30%

  • Wind: 25%–35%

  • BESS: 30%–40%

  • Bioenergy / WtE: 25%–40%


Preferred equity, mezzanine capital, and structured alternatives are commonly used to bridge these gaps, especially for developers who remain bullish but need more flexibility in capital allocation.



6. Strong Documentation Is the Competitive Advantage in 2025


One of the clearest differences this year is the weight lenders place on documentation quality. A fully prepared, lender-ready package has become the single strongest accelerator of financing timelines.


In practice, this includes:


  • robust market studies,

  • third-party resource assessments,

  • detailed, scenario-tested financial models,

  • transparent risk allocations,

  • complete permitting files,

  • EPC and O&M contracts with clear accountability,

  • and well-structured contingency planning.


Projects that demonstrate this level of readiness tend to move quickly through underwriting (sometimes in under 40 days). Projects lacking it are experiencing extended delays or early rejection.



7. The 2025 Capital Stack Is More Layered—and More Negotiated


One of the defining characteristics of renewable energy financing in 2025 is the emergence of more complex capital stacks. With senior lenders tightening leverage but keeping competitive terms for strong deals, developers are filling the remainder of their capital needs through:


  • mezzanine debt,

  • preferred equity,

  • tax equity (in applicable markets),

  • impact and concessional capital,

  • and increasingly, private credit (which has become a core participant rather than a niche lender).


This mix gives sponsors flexibility, but it also requires more intentional structuring.



8. A Practical PF25 Playbook for Developers


For developers seeking financing in today’s market, the winning formula is straightforward:


  1. Secure strong offtake agreements with tenors aligned to debt.

  2. Select proven EPC and O&M partners with demonstrable track records.

  3. Invest early in technical and market validation.

  4. Strengthen equity commitments and prepare layered capital strategies.

  5. Integrate storage where grid conditions or revenue models demand it.

  6. Prepare full lender-ready documentation before approaching funders.

  7. Demonstrate risk awareness and clear mitigation pathways.


Projects that apply this playbook are finding capital; those that do not are struggling to clear the first review stage.



Renewables Get Funded—But Only on 2025 Terms


The renewable energy sector remains highly bankable in 2025, but it is no longer operating on the assumptions of earlier cycles. Lenders expect more maturity, more data, more discipline, and more resilience. For developers prepared to meet these expectations, the capital is available - and often competitively priced.


As the PF25 series continues, the next article will examine Waste-to-Energy financing, a segment experiencing one of the fastest shifts in bankability standards in recent years.



Ready to position your project for financing success in 2026? Contact Amimar International to discuss how our specialized project finance consulting services can help you navigate today’s complex capital markets and optimize your development for financing.


**This analysis is based on comprehensive research of market data, banking reports, and regulatory publications current as of November 2025. Market conditions are subject to change.

Contact Us

CONTACT

LOCATIONS

OPENING HOURS

Email: info@amimarinternational.com
 

Tel: (514) 228-7493

Response Time: Within 24 hours.

MONTREAL

2001 Robert Bourassa,

Suite 1700

Montreal, QC  H3A 2A6

Canada

TORONTO

Toronto Exchange Tower

130 King Street West,

Suite 1900

Toronto, ON  M5X 1E3

Canada

Mon - Fri: 8am - 5pm

​​Sat-Sun: Closed

amimar international, canada project finance, project finance

© 2025 by AMIMAR INTERNATIONAL INC

bottom of page