Five Critical Forces Reshaping Project Finance Markets Following H1 2025

  • Writer: MJ Furey
    MJ Furey
  • Aug 27, 2025
  • 4 min read

Updated: Dec 16, 2025

project finance, project financing Canada

The commercial project finance landscape has been reshaped by a convergence of disruptive forces in the first half of 2025, creating significant headwinds for transaction volumes across North America and Europe . Unlike previous market cycles driven by singular events, today’s challenges stem from multiple, interconnected pressures that are fundamentally altering project economics, risk assessment, and the availability of capital .


As seasoned project finance advisors, we have analyzed the market data from H1 2025 to identify the primary destabilizing agents . This analysis offers a clear view of how projects get financed today and what sponsors, lenders, and investors must understand to navigate this new environment successfully .


Table of Contents


Trade Policy and Supply Chain Volatility


The most immediate impact on project finance has been the disruption from aggressive trade policies, including new tariffs that create profound unpredictability. For example, the recent implementation of a 25% tariff on most Canadian goods and a 10% tariff on energy imports has sent ripples far beyond bilateral trade relationships. Long-term infrastructure projects depend on stable cost assumptions, and when material costs for essentials like steel and aluminum can escalate overnight, it fundamentally disrupts project pro-formas. This volatility forces a complete re-evaluation of project budgets and timelines .


Inflation and Rising Interest Rates


Compounding the trade challenges are persistent inflationary pressures and the resulting rise in interest rates. Construction input costs have seen a dramatic surge, with steel prices increasing over 125% from early 2020 levels and overall building materials costs up 35.6% since the pandemic began. The Producer Price Index has also climbed 20% since January 2021, creating a dual impact: project construction is more expensive, and the capital required to finance it costs more. This environment necessitates more sophisticated financial engineering, including advanced interest rate hedging and alternative capital structures to absorb cost volatility .


Geopolitical Risk as a Central Factor


Geopolitical tensions have shifted from a background consideration to a primary risk factor in project finance underwriting. Ongoing global conflicts and heightened cybersecurity threats have introduced new categories of risk that lenders must now price into their models. European banking authorities report that the share of financial institutions experiencing successful cyber-attacks has nearly tripled since 2022, highlighting the tangible nature of this threat. For project sponsors, this translates to more intensive due diligence, a greater need for sophisticated political risk insurance, and a reduced appetite from lenders for transactions in regions perceived as exposed .


Navigating Regulatory and Compliance Hurdles


Regulatory uncertainty has created another layer of complexity, constraining available capital and extending financing timelines. For instance, uncertainty around new legislation, such as the “One Big Beautiful Bill” Act in the energy sector, has introduced new compliance requirements. Tax equity investors, who are crucial for many energy transition projects, now often demand enhanced third-party verification of a project’s activities. This adds both significant time and cost to the financing process, demanding greater foresight and planning from the outset.


Strategic Adaptation in the Current Market


Despite these significant headwinds, markets are adapting. Global project finance loan volumes rose 32% in H1 2025 to $207.5 billion, although this growth was concentrated in specific sectors like data centers and LNG projects rather than broad commercial development. Private credit markets have also seen record investment, signalling a selective rather than broad-based expansion. Success in this environment requires greater sophistication, robust risk management, and flexible deal structures. Projects that were once straightforward now demand more creative capital solutions to be viable.


Future Outlook and Key Takeaways


Moving through the remainder of 2025, several trends are expected to persist, demanding a strategic response from all market participants .


  • Enhanced Due Diligence: Lenders will conduct more thorough risk assessments, particularly around supply chain resilience and geopolitical exposure, leading to longer lead times for financing approvals .

  • Higher Equity Requirements: Sponsors should be prepared for equity contributions that are 20-30% higher than pre-2025 levels, as highly leveraged structures have become less common .

  • Alternative Capital Sources: With traditional bank lending capacity constrained, opportunities are growing for private credit funds, alternative lenders, and other innovative financing structures .

  • Geographic Selectivity: Projects located in regions with stable regulatory frameworks and diversified supply chains will command a premium and attract capital more easily than those in areas with higher perceived risk .



Conclusion: Excellence Through Expertise


The project finance landscape of 2025 requires deep market knowledge, sophisticated risk assessment, and creative problem-solving. While the environment presents challenges, it also creates opportunities for those equipped to navigate its complexity. At Amimar International, we provide the strategic vision and financial excellence needed to succeed in this evolving global marketplace.


Amimar International: Where Strategic Vision Meets Financial Excellence. Your trusted partner for sophisticated project finance advisory services in an evolving global marketplace. Contact us today to get started.



**This analysis is based on comprehensive research of market data, banking reports, and regulatory publications current as of August 2025. Market conditions are subject to change.



References:


Contact Us

CONTACT

LOCATIONS

OPENING HOURS

Email: info@amimarinternational.com
 

Tel: (514) 228-7493

Response Time: Within 24 hours.

MONTREAL

2001 Robert Bourassa,

Suite 1700

Montreal, QC  H3A 2A6

Canada

TORONTO

Toronto Exchange Tower

130 King Street West,

Suite 1900

Toronto, ON  M5X 1E3

Canada

Mon - Fri: 8am - 5pm

​​Sat-Sun: Closed

amimar international, canada project finance, project finance

© 2025 by AMIMAR INTERNATIONAL INC

bottom of page